Resource Allocation

 Resource Allocation describes the act of allocating available resources (e.g., personnel, equipments, budget and materials) to tasks and activities within a project. Implementation of proper resource allocation will comply with making the correct resources accessible at the correct time on a budget at the right amount and on the talked about objective of the project. It is essential to the project success because, with a lack of good resource management, delays and cost overrun may occur, not to mention the poor quality of the delivered project.

Key Components of Resource Allocation

1. Kind of Resources

o Human Resources (Team Members): Team Members who are employees or contract staff with certain skills that are required to complete project activities.

o Material Resources: The physical materials, supplies or equipments needed to do the project work (ex. construction materials, office equipments, software).

o Budget: The funds that will be used to finance the entire project cost (labor, materials, tools and the overhead).

o Time Resources: All time which can be used to finish off the project or the subsections of projects.

2. Resource Utilization

o Resource utilization is the efficiency in the utilization of the resources in the course of the project. This is significant in the control of over-allocation of resources as well as under-utilisation.

3. Resource Constraints

There is in many cases limited resources. The limitations may be in terms of lack of availability, budget or other restrictions (e.g., time, technical capability). Determining these restrictions in time can possibly stop any delays.

Phase of Resource Allocation

1. Project Resource Identification

Identify activities and tasks of the Work Breakdown Structure (WBS).

• Quantify the sets of skills to complete the various tasks (e.g., readers, writers, engineers).

• Expectation of the amount and kind of raw material/resources (e.g. software tools, hardware, office supplies).

• Establish outlay on each resource type.

2. Also assign Resources to Tasks

• Deploy the employees in jobs according to their aptitude, experience and availability.

• Deploy material resources depending on the work packages that will require them.

• It is important to allocate financial resources in the proper manner in every stage of the project.

• Take resource dependencies into account: In some cases, one task cannot commence until another is finished (e.g., coding can not begin until the design phase).

3. Form a Resource Schedule

• Prepare a timeline whereby you will have when each resource is required.

• On the part of human resources, make sure schedules of the team members are appropriately adjusted according to project needs (e.g., none of key team members is overbooked).

• In the case of material resources, ensure the delivery dates and stock.

• Critical Path Method (CPM): Seeks to identify activities of the project that are vital in project completion and so that you can prioritize resources accordingly.

4. Observe and Optimize Locus of Resources

• Monitor progress: Monitor resources utilization and progress of tasks with tools, such as Gantt chart or by using Kanban boards or project management software.

• Procedurally reassess and make adjustments: If there are delays or problems that cannot be avoided in allocation (e.g., a resource is unavailable or not utilized enough), it is necessary to make adjustments.

• Resource leveling: In the event an asset is over-assigned (ie., a team member has been overloaded), change the schedule accordingly or re-distribute the work in order to re-balance.

• Optimization: Assess continually that resources are used optimally and redistribute those that are ill used as bottlenecks could arise.

5. Share Resource Requirements and Limitations

• Communicate with stakeholders on the need of resources, usage and limitations. Considering the example, when supplementary resources are required to meet deadlines, one should refer to them as soon as possible.

• Report on resource levels and the level of risk to resource access (e.g., supply chain, key people departing).

Tools and Techniques of Resource Allocation

1. Resource Break Down Structure (RBS)

o As a hierarchical structure, the RBS elaborates the required resources in each project phase. It assists in determining and classifying all the project resources so that all the needed resources can be available at the appropriate time.

o Example: In a construction project, the RBS could comprise of labor, machinery and materials.

2. Gantt Charts

o Gantt charts may not only demonstrate the period of the project but also indicate when particular resources are to be required to accomplish particular tasks. They enable you to have the visual of resource allocation over time to prevent conflicts and overbooking.

3. Resource Histograms

o Resource histogram is a representation graphical of usage of the resource over a period. It may also be used to see whether a resource is over utilised or under utilised at any stage of the project.

Example: A bar graph of how many developers are necessary every week in the duration of a software development project.

4. Critical Path Method (CPM)

o CPM is utilized to identify the longest chain of a dependent task that ought to be finished on schedule earlier given that the project should be completed within its set time frame. Decision-making can be done with reference to these vital tasks.

5. Resource Leveling

One of the methods used to systematically correct the over-allocation of resources is resource leveling in adjustment of the project schedule. This can be manifested in increasing the duration of the project or allocating project tasks to other resources so that the projects can be evenly distributed.

Example: Assigning a developer tasks that overlap on time may require rescheduling of co-work that is not a critical, or require extra resources.

6. Project Management Software (e.g. MS project, Monday.com, Asana, Smartsheet)

These instruments usually have resource allocation built-in to them. They enable the project managers to allocate, monitor and change resources succinctly on a singular program.

Such features are the ability to assign tasks and balance the workload, schedule resources and monitor progress in real time.

Best Project Resource Allocation

1. Lay into this Early and Resource Planning

 Invest in resources as early in the project lifecycle as possible and ensure you consider the needed resources. This provides a room of readjustment in case of any change of plans.

2. Control Consumption of Resources

o Make it so that there is no over-or-under allocation of resources. Allocation of resources that are more than depicts burnout or delays whereas under allocation depicts inefficiency and idleness.

3. Priority Critical Resources

o Understand which resources are essential to the project at hand, say, key team members, or equipment etc. and make sure these can be accessed on time. Failure to have a crucial resource can lead to the project being delayed.

4. Expecting Resource Blockage

o Define possible bottlenecks in resource distribution at an early stage. As an example, in case the only team member possesses the skills to perform a specific task, the availability of that individual may slow the task.

5. Regularly Update Resource Plans

 Adjust your resource allocation plan as the project develops to accommodate changes in project scope, project tasks and/or resource availability.

6. The key is communication

o Maintain an ongoing communication process involving the project manager, project team and the stakeholders regarding resource needs, availability, and limitation. This will make everything be on the same level and prevent misunderstandings or conflicts.

Example of Resource Allocation

Let's assume you are managing a Website Development Project. Here's a simple example of how you might allocate resources:

Task Start Date End Date Assigned Resource Resource Type Notes

1. Design Website 01/01/2024 01/10/2024 Sarah Lee (Designer) Human (Design) Requires access to design software

2. Develop Backend 01/11/2024 01/30/2024 John Doe (Developer) Human (Development) Server setup required

3. Develop Frontend 01/15/2024 02/05/2024 Alex Kim (Frontend Dev) Human (Development) Needs access to code repository

4. Testing 02/06/2024 02/15/2024 Testing Team (2 people) Human (Testing) Testing hardware and tools required

5. Launch Website 02/20/2024 02/22/2024 IT Support (2 people) Human (IT Support) Requires deployment tools

Resource Allocation Notes: You’ve allocated specific resources (e.g., developers, designers) to the tasks, along with required tools or equipment. Resources are distributed in a way that avoids over allocation (e.g., John Doe isn't assigned tasks during the same timeframe as Sarah Lee).

Conclusion

An efficient allocation of resources is the key area of a successful project management. Proper identification of the resource requirement and mapping the resources to the tasks, actively managing the resource and changing the allocations during the project lifecycle will ensure that the resources work effectively, the project is timely delivered and the project works on a tight budget. Be it human resources, financial resources, or equipment it is always true that the point is efficiency creation to remove or avoid bottlenecks and keep the project on schedule.